Ölçer Enerji’s development from distribution networks to high-voltage transmission infrastructure.

01 / Foundation

1970 – 1989

0.4 kV

Field knowledge became a corporate foundation.

Work that began in Bitlis and Tatvan grew through contracts for the Turkish Electricity Authority.

  • Founder Mehmet Salih Ölçer’s first years in the sector
  • TEK rural electrification contracts
  • The foundation of Ölçer İnşaat Elektrik ve Ticaret in 1989
02 / Distribution

1990 – 2008

36 kV

Distribution experience expanded across 14 provinces.

Urban, rural and industrial networks turned regional delivery into nationwide field capability.

  • Urban and rural networks across Eastern and Southeastern Anatolia
  • A new operating geography extending from İzmir to Sakarya
  • Van and Iğdır OIZ infrastructure and the TPAO Batman power line
03 / Move to transmission

2009 – 2016

154 kV

From maintenance and line work to turnkey substations.

Long-term maintenance contracts, power lines and the first turnkey 154 kV substation came together in this period.

  • The 60 km Doğubeyazıt–Çaldıran power line
  • Five-year maintenance contracts in the Vangölü and Hakkâri regions
  • Joint stock structure in 2013; Engil 154 kV substation in 2014–2015
04 / High voltage

2016 – today

400 kV

National-scale 380 and 400 kV transmission projects.

Turnkey substation and transmission-line capability reached a new scale through schedule and quality performance.

  • İzmit 380 kV connections completed 52 days ahead of contract
  • First wind-farm connection through Balıkesir 2 SS–Susurluk WPP
  • Tatvan 380 kV lines and the 2024 Alparslan HPP variants