PROJECTS
Engineering, delivered.
Completed power transmission, distribution and infrastructure projects across Türkiye.
Project archive
From transmission lines to urban networks.
Explore completed works by business area, location or project name.
40projects
19provinces
↗Bitlis · 2017 – 2018
Tatvan 380 kV Connection Lines
380 kV / Transmission
↗Kocaeli · 2015 – 2016
İzmit 380 kV Substation Connections
380 kV / Transmission
↗Van · 2014 – 2015
Engil 154 kV Substation
154 kV / Transmission
Completed works
Project archive
40 projects found
- Transmission2017 – 2018
Tatvan 380 kV Connection Lines
Bitlis / 380 kV
↗ - Transmission2015 – 2016
İzmit 380 kV Substation Connections
Kocaeli / 380 kV
↗ - Transmission2014 – 2015
Engil 154 kV Substation
Van / 154 kV
↗ - Transmission2013
Trakya Döküm 154 kV Substation
Tekirdağ / 154 kV
↗ - Transmission2014
Kovanlık Temporary Substation and Line
Ordu / 154 kV
↗ - Transmission2024
Alparslan HPP SS – Adilcevaz SS (double circuit, 1272 MCM, ~4.52 km) and Alparslan HPP SS – Hınıs SS (single circuit, 1272 MCM, ~2.56 km) transmission line variants, 154 kV
Muş / 154 kV
↗ - Transmission2016 – 2017
Balıkesir SEKA and Susurluk WPP feeder installation at Balıkesir 2 SS, 154 kV
Balıkesir / 154 kV
↗ - Distribution2009 – 2011
Doğubeyazıt SS – Çaldıran DC 60 km, 33 kV single circuit 477 MCM distribution line
Van / 33 kV
↗ - Distribution2008 – 2009
Village and township (KÖYDES) LV+MV and distribution line installations in Van and Hakkâri
Van, Hakkâri / AG + OG
↗ - Distribution2005 – 2006
City centre underground cable LV+MV installation
Kahramanmaraş / AG + OG
↗ - Distribution2005 – 2006
City centre underground LV+MV installation
Niğde / AG + OG
↗ - Distribution2004
LV+MV installations in villages of Uludere and Beytüşşebap districts
Şırnak / AG + OG
↗
No projects match these criteria.
Try a shorter search term or clear the filters.
12 / 40 projects shown